Building Take-Off Program
Precision & Speed in Estimating

Put a job in, get a clean material grid out — items & counts, our SKUs, our conventions. Turns a two-hour takeoff into a fifteen-minute review.

Draft for salesman review
No pricing
Roof sheathing — no trusses
Our SKUs & conventions
— The Tools —
01
Garage / Shop Take-Off
Enter the job, doors & windows, and your name — every line reflows. Plates, studs, sheathing, roofing, siding, soffit & fascia, doors, hardware. Print a clean worksheet to verify.
OPEN →
02
Floor Span Check
BCI joist spacing vs Four-Star span — the fewest sticks that hold, with pony-wall and special-order paths and the matching subfloor.
OPEN →
Every grid is a draft for salesman review, never a final number.
Vireo flags & proposes — it does not engineer. The stamp stays with the stamp.